Pam--

Typically in the design of curation facilities, an architectural firm will design the overall facility and will then subcontract to engineering firms to design the structural and environmental systems.  An engineering firm would not typically design the overall facility.  If you just need new environmental systems, however, you might contact an mechanical engineering firm.  Can you tell me a little more about your project?  I might then be able to steer you in the right direction.

Guy

On Sep 11, 2007, at 4:44 PM, Pamela Endzweig wrote:

I am interested in obtaining recommendations and contact information for West Coast/Pacific NW consultants with engineering expertise relating to the design of museum curation facilities, in particular with regard to new buildings and environmental controls. 

------------------------------
Guy Hermann
Director of Museum Planning
E. Verner Johnson and Associates
Museum Architects and Planners
http://www.museumarchitects.com    

222 Berkeley Street
Boston, MA 02116
v: 617.437.6262
f: 617.437.1272



========================================================= Important Subscriber Information:

The Museum-L FAQ file is located at http://www.finalchapter.com/museum-l-faq/ . You may obtain detailed information about the listserv commands by sending a one line e-mail message to [log in to unmask] . The body of the message should read "help" (without the quotes).

If you decide to leave Museum-L, please send a one line e-mail message to [log in to unmask] . The body of the message should read "Signoff Museum-L" (without the quotes).